Going solar in four simple steps
We handle the survey, sizing, permits, installation, and after-sales. You just choose the package.
- 01
Free consultation and site survey
Tell us about your home and your monthly bill. We visit, check your roof, and run a load assessment to size the right system.
- 02
Choose your package
Pick from our 3 kW, 6 kW, 8 kW, or 12 kW hybrid packages, or let us customise one. We offer a wide selection of inverters and batteries.
- 03
Certified installation
Our team installs your panels, hybrid inverter, and battery bank, then commissions the system and shows you how it works.
- 04
Monitoring and maintenance
Every package includes monthly monitoring and maintenance for two years, so your system keeps performing at its best.
Solar panels plus a battery, working together
Daytime
Your panels power the house directly and charge the battery. Excess demand is drawn from the grid only when needed.
Night-time
The battery supplies your essential loads, so you buy less electricity from the grid during peak evening hours.
Brownouts
When the grid goes down, the hybrid inverter switches to battery power automatically. Lights, fans, and internet stay on.
Common questions
What does all-in include?
The package price covers the panels, hybrid inverter, battery, mounting, wiring, installation labour, commissioning, and two years of monthly monitoring and maintenance. You receive an official receipt.
Will my lights stay on during a brownout?
Yes. Every package is a hybrid system with a battery bank, so essential loads keep running when the grid goes down. How long depends on the battery size and what you are running.
Which package size do I need?
It depends on your monthly consumption, roof space, and which appliances you want to run. Our free site survey and load assessment will recommend the right size. The best-for notes on each package are a good starting point.
What is the warranty?
Inverters and batteries carry up to a 10-year warranty depending on the brand you choose, following manufacturer terms. We offer a wide selection of inverters and batteries and will walk you through the options.
How long does installation take?
Most residential installations are completed in one to two days after the site survey and materials are ready.
Ready to switch to solar?
Book a free consultation. We will assess your home, recommend the right package, and give you an all-in quote with no obligation.